Conifer Mine Treatment System

The Conifer Treatment System is a passive treatment system located on a mine discharge in Beaver Run Watershed in Beaver Township.  The original system was built in 1998.  The water chemistry changed in 1999.  The ferric iron and aluminum in the discharge led to premature plugging of the ALD.  A project to regrade the limestone in the ALD, and fill a portion of the settling pond with limestone to create a large limestone bed (FeAlMn bed) was completed in July, 2011.  Through funding from the Redbank Creek Watershed Trust, maintenance on the system is done to unclog the bed and restore permeability when needed.  The District continues to do water monitoring to access how the chemistry of the water has changed with treatment.

 

 

Treatment System Outfall

FeAlMn Bed

Limestone Filtration System

An aerial view of the treatment system

Water Protection
Watersheds
Special Projects
jccd2021051014.jpg
Design Aids
Resources & Links
jccd2021051013.jpg
Agriculture
Dirt & Gravel Road Program
Environmental Education
E & S Control
Special Projects
Stormwater
Water Protection
jccd2021051012.jpg
About Us
History
60th Anniversary
70th Anniversary
75th Anniversary
Our Mission
jccd2021051011.jpg
Publications
Pond Information
Right-To-Know
Tick Information
jccd2021051010.jpg
Municipal Info
Township Information
jccd2021051009.jpg jccd2021051006.jpg